LASEMA demolishes four buildings under construction in Ikoyi for failing integrity test

The Lagos State Emergency Management Agency (LASEMA) has pulled down four two-storey buildings under construction in Ikoyi for failing integrity test. LASEMA Director-General, Dr Olufemi Oke-Osanyintolu, made the disclosure in Lagos on Saturday, November 2nd sayng the four buildings under construction at Glover Court, Ikoyi, were in the same compound where a building collapsed on Friday.“The test was conducted by Solid Material Testing Agency, Lagos State Building Control Agency and the Ministry of Physical Planning. “The test was conducted following rescue of four persons and recovery of one body in the collapsed building at 4:10p.m on Friday.“The decision to pull down the buildings is to avert further loss of lives and property. The operation is now completed,” Oke-Osanyintolu said.The post
LASEMA demolishes four buildings under construction in Ikoyi for failing integrity test appeared first on
Linda Ikeji Blog.
from Linda Ikeji's Blog https://ift.tt/33cTIm1
Labels: Linda Ikeji's Blog, news
0 Comments:
Post a Comment
10FR73
Subscribe to Post Comments [Atom]
<< Home